The grid takes years to build.
Growth can't wait that long.

Here's how Telemetry Offsetting closes the gap — in under two minutes.

Scroll
The problem

Fast growth, slow grid.

New data centers and generators want to connect today. But the grid is built for 100% delivery on peak hours — and this level of certainty takes years of study and upgrades.

Some grid operators offer a faster path: connect now, accept curtailment when the wires get crowded. It's a start.

Large load developers will try to manage this risk by pairing a battery next door. But the grid doesn't see the two as connected — it will curtail the load AND dispatch the battery in the same instant, treating a coordinated pair like two strangers.

The solution

Telemetry Offsetting closes that gap.

In real time, the paired battery's availability sets the load's guaranteed operating floor. Together, they show up on the grid as one predictable, net-zero draw — not two unrelated resources.

The load runs firm. The battery does the work. And it's all verified the next day during settlement, with no new real-time systems for the grid to build.

Why it's safeOne rule doesn't bend: in a true system-wide emergency, the shield drops, and both assets return to standard dispatch — same as everyone else. Telemetry Offsetting manages local congestion. It is never a system emergency exemption.

At scale

One project is a good deal. Wide adoption will unlock the grid.

Developers privately finance the flexible capacity the grid needs. Utilities de-risk every long-lead upgrade.

And once that upgrade is done, both assets simply convert to normal, firm service — no permanent carve-out, no cost to ratepayers.

Join us

One grid. Built for everyone.

Join the Global Capacity Alliance, and let's scale the solution.

Join the alliance
Go deeper

Want the full mechanism?

The spine above is the whole idea. These four sections are for anyone doing real diligence — regulators, utility teams, and developers who want the mechanics.

How today's grids are embracing speed

Some grid operators already offer a faster path onto the grid: connect immediately, ahead of full network upgrades, and accept the risk of curtailment when the wires get crowded during peak conditions.

ERCOT, in Texas, calls this "Connect and Manage" — it's why interconnection there has historically moved faster than in many other U.S. markets.

That same logic is now extending to large loads. ERCOT's planned PCLR program will let big loads energize early on the same terms: operating like an energy-only generator, flexing off the grid during congestion, until upgrades are complete.

FTM vs. BTM — why not just go behind the meter? You can!

While FTM solves various challenges like common ownership requirements and tax treatment, BTM suffers from a common misconception. Meters are for settlement. Even if you drop a new reource BTM, the grid operator will require that the resource be separately integrated and dispatched in the grid engine (SCED). This is due to operational and reliability needs and isn't a rule that is likely to change. In any RTO or ISO.

So BTM, Private Use Network (PUN), or any of the new "energy campus" constructs being discussed nationally all suffer from the same challenge - the grid will force separation between flexible load and any resource, cracking open the attribution gap.

In all cases, Telemetry Offsetting rebuilds attribution while allowin both to be fully visible to the grid.

The commercial mechanism

The financial engine behind Telemetry Offsetting is the Offset Agreement. Under this tolling arrangement, the paired resource acts as a physical buffer, absorbing unpredictable grid curtailment on behalf of the load.

In exchange, the load underwrites that capacity — giving the resource's owner the creditworthy revenue stream needed to unlock construction financing.

It's an interim commercial bridge: the load gets firm service now, while the utility builds the permanent upgrade on its own timeline.

The case for urgency

Speed matters because growth has another option. When large loads can't find a fast, coordinated path onto the shared grid, they can build their own power instead.

Private generation, off-grid, running for decades outside shared oversight and outside the system that funds upgrades for everyone else.

Telemetry Offsetting offers a faster path onto the grid instead — keeping that growth working for the whole system, rather than going around it.